Ipsum Utilities

Faults & Reactive Services

We support our DNO clients with key resource including senior authorised engineers and fully equipped overhead line teams (4x4 pole lorries, MEWPS, tracked excavators) during emergencies caused by extreme weather.  During periods of high winds or heavy snow and ice, multiple faults can occur on the high and low voltage distribution networks and supplies to customers can be affected. Our teams will assist in locating and repairing these faults or connecting temporary generation.

Defect correction

Ipsum provide complete turnkey substation supply and installation services up to 66kV

Network Events

Our professional jointing resources undertake a variety of key work activities associated with the repair and reinforcement of the Electrical Distribution Network including during severe weather events.